Concrete Confinement Using Fiberglass
FIELD SERVICES CASE STUDY
MAY 18TH, 2023
A new bridge deck had been installed and the client wanted to wrap the 15 columns. HydraTech Field Services provided concrete confinement with fiberglass wrap and a weather-resistant coating was added atop the fiberglass. The entire project took about 3 weeks.