FINISHING UP ONE OF OUR BIG PROJECTS
We Will Be Headed Home Soon
Icon WriterDavid Dubois, 3/30/2023
Two of the three culverts have been completed. We are working in the last four by six-foot culvert to install the remaining 23 seals. This leg of the project is much the like previous one, but I miss the mobility of the taller culvert. The short culvert restricts our movement and speed to a degree and these joints have some loose debris that needs to be swept away before installation. Beyond that, it is more of the same, drilling, inserting anchors, expanding the bands, and trimming the anchors. We are projected to complete the entire project, 189 HydraTite seals, early April.
Looking out of a long box culvert
Looking out of a long box culvert

Beyond the job, Cody, Cameron, Ben, and I have been sharing an Airbnb. We frequently play Call Of Duty at the end of the day, which has been fun. Mardi Gras is really big down here and we got blocked in by the parade on our way back from work. It was nice to see them go by though. 

Holes in the wall of a box culvert on either side of a joint
Holes in the wall of a box culvert on either side of a joint
Looking out of a long box culvert

Technician crouching in a box culvert

Working Under An Active Airport

5:20

Opening to a short box culvert
Long dark box culvert with field techs at the other end with headlamps
close up of the OTEC Logo
close up of the OTEC Logo
orange emblem, 'Update!'

The project is now complete and this case study details this entire project.

SHARE NOW

LinkedIn logo  Facebook logo  Twitter logo  Instagram logo
Three people looking at a piece of pipe in which they are installing HydraTite

Last Post:
EXPLAINING HYDRATITE’S INSTALLATION

Newly laid concrete right outside a door

Next Post:
ENHANCING OUR PARKING LOT